Primary voltage vs. secondary
The purpose of this test is to check the operation of a Coil-On-Plug (COP) unit having an externally switched primary circuit by evaluating the primary circuit voltage and the resulting secondary voltage using a Coil On Plug (COP) and Signal Probe.
This test involves measuring a potentially hazardous voltage.
Risk of damage to equipment and property, and risk of electric shock, personal injury, or death.
- Always follow manufacturers' safety instructions and working practices.
- Ensure the equipment and accessories have a voltage rating that meets or exceeds the possible test voltages.
- Use suitable attenuating test leads or accessories to avoid damaging your scope.
- When using BNC accessories, adjust the probe setting in the PicoScope software to apply the appropriate attenuation scaling to your measurements.
How to perform the test
- Connect a test lead with a 20:1 attenuator to Channel A and the coil's switched earth circuit.
- Connection a Coil On Plug (COP) and Signal Probe to Channel B.
- Start the engine and run at idle.
- Start the scope to see live data.
- Place the tip of the COP and Signal Probe on a coil and move it around carefully to find the best signal.
- If required, vary the engine load and RPM as required to stimulate a misfire, and look for waveform changes.
- When your waveforms are captured, stop the scope.
- If necessary, repeat the test, placing the COP and Signal Probe tip on other coils, using consistent tip placements to ensure the best signals.
Disclaimer
This help topic is subject to changes without notification. The information within is carefully checked and considered to be correct. This information is an example of our investigations and findings and is not a definitive procedure. Pico Technology accepts no responsibility for inaccuracies. Each vehicle may be different and require unique test settings.