VVT control solenoid
The purpose of this test is to evaluate the operation of the variable camshaft timing control solenoid based on the switching voltage and duty control during engine run conditions.
How to perform the test
- Connect a test lead to Channel A and the VVT control solenoid switched earth circuit.
- Start the engine and run at idle.
- Start the scope to see live data.
- Vary the engine RPM and look for waveform changes.
- When your waveforms are captured, stop the scope.
- Turn off the engine.
Disclaimer
This help topic is subject to changes without notification. The information within is carefully checked and considered to be correct. This information is an example of our investigations and findings and is not a definitive procedure. Pico Technology accepts no responsibility for inaccuracies. Each vehicle may be different and require unique test settings.